Episcopal High School Student Center

Houston, Texas   |   Education

CLIENT: Episcopal High School

SIZE: 31,797 sf

SERVICES: Full Architectural Services

DATE COMPLETED: September 2018

Episcopal High School, a private school in Bellaire, Texas, hired Studio RED Architects for the second phase of their long-range campus master plan. The project goal was to recreate the existing Underwood Student Center, and the result is a world class facility supporting growth of over 800 students. The project provides additional space for students to gather for study, fellowship, meals, meetings, and extracurricular activities.

To achieve the vision, the existing Underwood Student Center and Alkek Gym, the oldest facilities on campus dating back to the 1950s, were demolished. The existing servery and kitchen was renovated to accommodate the new facility program. A new dining space accommodates 500 students and staff and is comprised of traditional and casual seating options to reflect a modern student culture equivalent to higher education atmospheres. Because the Student Center is more than a dining facility, spaces accommodate art exhibits, theater, STEM learning maker spaces, study areas, and faculty offices. A coffee shop is also included as an amenity to students and faculty. A large public plaza links the Student Center with the adjacent Trotter Academic Building and Hildebrand Athletic Center. The design and positioning of the project knits together older and newer areas of the campus, establishing a hub for student life, circulation, and activity.

 

Episcopal High School Student Center

Houston, Texas   |   Education

MEMORABLE NOTE: This project required complex phasing to maintain campus operations throughout construction.

CLIENT: Episcopal High School

SIZE: 31,797 sf

SERVICES: Full Architectural Services

DATE COMPLETED: September 2018

Episcopal High School, a private school in Bellaire, Texas, hired Studio RED Architects for the second phase of their long-range campus master plan. The project goal was to recreate the existing Underwood Student Center, and the result is a world class facility supporting growth of over 800 students. The project provides additional space for students to gather for study, fellowship, meals, meetings, and extracurricular activities.

To achieve the vision, the existing Underwood Student Center and Alkek Gym, the oldest facilities on campus dating back to the 1950s, were demolished. The existing servery and kitchen was renovated to accommodate the new facility program. A new dining space accommodates 500 students and staff and is comprised of traditional and casual seating options to reflect a modern student culture equivalent to higher education atmospheres. Because the Student Center is more than a dining facility, spaces accommodate art exhibits, theater, STEM learning maker spaces, study areas, and faculty offices. A coffee shop is also included as an amenity to students and faculty. A large public plaza links the Student Center with the adjacent Trotter Academic Building and Hildebrand Athletic Center. The design and positioning of the project knits together older and newer areas of the campus, establishing a hub for student life, circulation, and activity.

 

Similar Projects

Let's talk about your project.